Construction Update 8/3/16
Thanks to the hard work and heavy lifting of a number of Calvary men, time and money was saved as old bushes were removed from the front of the building. This work was done to prepare the space for new drainage pipes to be buried so that water from the roof could be redirected to the downhill side of the building.
Today, these trenches were dug which required a portion of the sidewalk to be temporarily removed. The roofing work was delayed due to very warm weather, but is scheduled to begin any day.